Weaver's Court

Full family bathroom, six working days

A 1930s semi in Weaver's Court with a bathroom that had not been touched since the seventies, handed over on the day promised.

Client

Private

District

Weaver's Court

On site

6 days

Figure

$11,400

Finished

On the day

The brief

The room had a boxed-in cylinder, a bath nobody used and a floor that had been tiled over twice. The owners wanted a walk-in shower, storage that was not a cupboard, and the airing cupboard back as a wardrobe.

The complication was the soil connection: it ran through an external wall at a height that put the new pan two hundred millimetres out. Rerouting it internally cost a day but avoided scaffolding, which paid for itself twice over.

What we did

Strip out and cart away, floor levelled and re-boarded, the soil rerouted, underfloor heating laid across the whole floor, then first fix, tiling, second fix and a snag list walked with the owners before the final invoice.

Scope

Strip out

Full, including two tile layers

First fix

Soil reroute, hot and cold reruns

Heating

Wet underfloor, one zone

Tiling

Floor and full-height walls

Second fix

Walk-in shower, vanity, towel rail

Making good

Plaster and paint, hallway included

“They told us six days at the start and handed it over on the sixth day. The only surprise was the hallway being repainted, which nobody had asked them to do.”

Sarah Thompson

Weaver's Court

Quoted

$11,400

Invoiced

$11,400

Days quoted

6

Days taken

6