24/7 Emergency
0800 612 9871
Home
›
Projects
Six recent jobs across the nine districts. Every one was done by an employed Mainsford engineer and photographed on the day of handover.
Jobs this quarter
212
Finished on the day quoted
97%
Average bathroom
6 days
Returned to inside 12 months
1.4%
Rated
4.9/5
Bathroom installation · Weaver's Court
Strip out, new first fix, underfloor heating and a fitted oak vanity. Handed over on the day promised.
Heating upgrade · Bramfield Road
A cold back bedroom for four winters. Power flush, new valves throughout, and a room that finally holds 21 degrees.
En suite · Orchard Row
New soil connection, a pumped shower and a towel rail run off the existing system. No new boiler needed.
Boiler installation · Nethermoor
Fire and back boiler removed, chimney capped, combi mounted in the utility and the airing cupboard handed back.
Underfloor heating · Kelder Bridge
Manifold in the utility, six zones across the ground floor, commissioned and balanced before the screed went down.
Landlord portfolio · Foundry Quarter
A whole portfolio brought onto one renewal date, with the tenants contacted directly to arrange access.