Three questions a surveyor always asks, and nobody prepares for

The roof, the wiring and the drainage, in that order. Finding the three dates before the survey is booked has saved two of our sales this year.

The roof void at Lot 03, where the first of the three questions is usually answered

3
dates

Roof, wiring and drainage, asked in every survey

2
of 11

Sales saved this year by having them ready

10

The week in which the survey usually lands

The claim

“The survey is the buyer’s problem.”

It is the buyer who pays for it, so vendors tend to treat the survey as something that happens to someone else. It lands in week ten, the surveyor asks three questions, and nobody in the house can answer them.

The questions never change. When was the roof last replaced, when was the house rewired, and where does the drainage run. An answer of “we are not sure” turns each one into an allowance, and three allowances together are enough to reopen a price that took eight weeks to agree.

What we did

The three dates found before the survey is booked, and put in the particular.

Since the spring we ask for the three dates at the valuation and chase the paperwork before launch. Twice this year the buyer’s surveyor raised all three, and both times the answers were already in the contract pack.

What the three dates did

Lot 03

Roof 2015, rewired 2011

No allowance

Price held

Lot 01

Drainage traced to the lane

No allowance

Exchanged in week eleven

Lot 08

Roof date not found

$38,000

Allowance agreed

None of this is difficult. It is simply easier in week one, with the owner in the house and time to look, than in week ten with a buyer waiting for a reply.

Written between viewings · Havilon & Co.