Most people expect a week. A sound oak floor in a three-bedroom house takes us three days, and most of that is drying time.
Day one: sanding
We start with a coarse paper to take the old finish off, then two finer passes to close the grain. A living room takes about four hours; a hall and stairs take longer than their size suggests.
Day two: stain and the first coat
We brush six test stripes in the morning and you choose in daylight. Stain dries for four hours before the first coat goes on.
The floor decides the schedule. We only decide how carefully we sand it.
Day three: two more coats
Each coat needs four hours with the windows cracked. After the last one, keep to socks for a day and wait two days before the furniture goes back.
Living room, 300 sq ft: one day of sanding
Hall and stairs: one day, by hand on the treads
Bedrooms: half a day each
If the boards are soft or thin from earlier sanding, we say so at the measure, before anything is booked.