/

/

Bathroom & Kitchen Tile

Showers, walls and backsplashes.

Waterproofed first, set level and grouted tight, by the tile crew.

Finished in May

Guest shower, Littleton

Porcelain 12 x 24 in, mosaic floor

A shower is a waterproofing job first.

The membrane goes on before any tile, and the flood test runs for 24 hours.

Bathroom and kitchen tile

From $18 / sq ft, installed

A shower

5 days

A backsplash

1 day

Flood test

24 h

Two rooms, one tile crew.

Bathrooms

Shower walls, niches and benches, heated floors and tub surrounds.

From $18 / sq ft

Kitchens

Backsplashes, feature walls and floors that take a dropped pan.

From $16 / sq ft

A backsplash in a single day.

8 a.m.

counters covered, outlets off

5 p.m.

set, grouted and wiped down

Cook as usual the next evening.

Shower and kitchen questions.

Asked at nearly every bathroom measure.

Yes: walls, bench, niche and floor, with corners sealed in fabric before any tile.

Usually not. We take it off, patch the wall and start flat.

We work with two licensed plumbers we trust and book them for you.

72 hours after the last grout, so the joints cure hard.